Scenario:
An old boiler model was being used. The bricks installed in the boiler were of typical sizes, which were impractical to manufacture because the industry usage of bricks was very low and that too of various sizes and shapes.

Solution:
We advised them to go for cement castable which was then done at the site itself.

Benefit:
By doing this the customer saved lot of time, money and delivery period time.